Table of Contents
2003-07-28: Enthusiasm
2003-07-27: In the beginning….
2003-07-29: Humidity
2003-08-01: A beaut bloke
2003-08-09: Officially committed
2003-09-16: Site preparation
2003-09-17: Do we drive to Airlie Beach?
2003-10-10: Anticipation…
2003-10-13: Shed floor
2003-10-13: Builder’s Risk Insurance
2003-10-14: Dispatched
2003-10-16: Paving of shed floor completed
2003-10-18: Shed roof
2003-10-18: Minimalism
2003-09-21: Preparing Site
2003-09-24: ATL Composites – Order
2003-10-23: Boat in a box
2003-10-31: Shed roof problem
2003-11-04: Shed design
2003-11-05: Z-Press collection
2003-11-07: Airlie Beach
2003-11-08: Halcyon
2003-11-12: Adventures of a z-press
2003-11-13: No time to be idle
2003-11-19: Boat building apprenticeship
2003-11-20: Z-Pressing
2003-11-29: Airconditioned shed!
2003-12-01: Wet layups
2003-10-22: Delivery – Composite Boat Building Kit and Materials
2003-11-11: The Shed
2003-11-17: Pressing and Cutting Panels
2003-12-12: Fillets
2003-12-13: Cake Icing?
2003-12-14: Outahia
2003-12-01: The Work Area
2003-11-19: Starting the Starboard Hull
2003-12-19: Cyclone threat
2003-12-20: Cyclone preparation
2003-12-21: Very wet….
2003-12-23: Ex-tropical cyclone Debbie
2004-01-19: Starboard bulkheads
2004-01-23: Part-time boat builder
2004-01-26: With a little help from my friends…
2004-01-31: Injury!
2004-02-14: Hull Rollover Soon
2004-02-15: Starboard Hull Turning
2004-02-28: Binary’s length
2004-03-23: Shed too low
2004-04-16: Toilets
2004-04-26: Raising the shed roof
2004-05-03: Setback
2004-05-05: Tenders
2004-03-20: Taping outside starboard hull
2004-03-21: Moving port hull panels
2004-04-17: Marking sacrificial keel
2004-07-31: Starboard keel and bow
2004-10-28: What happened to the project?
2004-10-30: First storm for season
2004-10-31: Dipped in chocolate
2004-11-07: Finally – One Hull Shell!
2004-11-08: You should work on the boat everyday…
2004-11-25: Storm Damage to Our Boat Shed
2004-11-29: Repairing and Raising the Boat Shed Roof… Again
2004-11-20: Port Hull – Preparation
2004-12-03: Port Hull – Bilge Panels
2004-12-09: How to Fit a Bloody Big Sheer Panel Alone
2004-11-21: Port Hull – Laying the Keel Panel
2004-12-07: Port Hull – Joining Hull Panels: Fillets, Wet Layup of Glass Tapes, Peel Ply
2004-12-08: Now we have a 13.5 metre canoe
2005-01-06: New Year Resolution No 1 – Build some more boat!
2004-12-10: Nocturnal Catamaran Building
2004-12-17: Funny who you bump into whilst on holidays…
2005-01-11: Port Hull – Chamfer and Bridgedeck Panels
2005-01-15: The Hull – Swim Platform Join
2005-01-16: Tarp City
2005-01-23: Port Hull – Bulkheads
2005-01-26: Port Forebeam Bulkhead
2005-02-12: Port Horizontal Support Bulkhead
2005-02-13: Tools used to build Binary
2005-02-14: Peel Ply
2005-02-20: Port Sail Locker Bulkhead
2005-02-21: Port Front Structural Bulkhead
2005-02-24: Port Chainplate Bulkhead
2005-02-27: Turning the Port Hull Upsidedown
2005-03-14: Last week an earthquake, now a cyclone!
2005-03-14: Checking for any weather damage
2005-03-17: Post Cyclone Ingrid
2005-03-21: Why we can’t stay with the boat during a cyclone…
2005-03-28: The project is back on course
2005-05-02: Peel Ply Removal Port Hull Underside
2005-05-10: Preparing Concave Joins Port Hull Underside
2005-05-14: Concave Joins Port Hull Underside
2005-05-22: Bilge Exterior Fillets Port Hull
2005-05-24: Sanding Bilge Exterior Fillets Port Hull
2005-06-12: Finished Fillets External Bilge & Keel Port Hull
2005-06-13: Reinforcing Tapes to the External Bilge & Keel Port Hull
2005-06-20: Sacrificial Keel Port Hull
2005-07-09: A Different Sailing Rig for Binary
2005-06-26: If I had a boat I should have gone sailing
2005-07-02: Creating the Fine Bow on the Port Hull
2005-09-13: More of the Sacrificial Keel Port Hull
2005-10-03: Finishing the Port Hull Sacrificial Keel and Bow
2005-10-10: Biaxial Glass Over Port Keel
2005-11-13: The Least Inspiring Aspect of Boat Building
2005-10-29: Good excuse for not working on the boat today
2005-11-27: More Fairing Compound
2005-12-12: Fairing the Port Hull
2006-01-16: Boat Fairing Methods and Tools
2006-02-04: Copper Antifouling On Port Hull
2006-03-27: Bridgedeck Support Beams
2006-04-15: Our Catamaran Forebeam Stored Under House
2006-04-15: Preparing to fit the Bridgedeck Beam
2006-04-16: Duflex – Chine Join – Section Cut Away
2006-04-23: Guess What We’re Doing At The Moment
2006-04-25: Yet Another Cyclone – Severe Tropical Cyclone Monica
2006-05-10: Pretty Maids All In A Row
2006-05-21: Preparing the Starboard Bridgedeck Beam
2006-05-20: Arrival of Nomen Cleats
2006-06-13: Attaching the Starboard Bridgedeck Beam
2006-06-14: Sealing Port Bridgedeck Underside
2006-06-14: Final Hull Turning – Port Hull Upright
2006-07-06: Aligning Binary Bridgedeck Halves For Joining
2006-07-17: Preparing to Tape the Bridgedeck Join
2006-07-11: Annual Oram Structural Inspection
2006-07-17: Taping the Bridgedeck and Structural Beams
2006-07-22: Video of Z-Pressing and Cutting Out Panels
2006-07-23: We Now Have A Boat
2006-08-13: Stern Beam
2006-08-15: Stern Beam Preparation
2006-08-20: Reinforced Cut-outs
2006-08-20: My Version of a ‘Z Join”
2006-09-03: Rear Lower Unidirectional Flange
2006-09-18: Taping The Back Web
2006-09-30: Aurora Binary
2006-09-30: Annual Pre Wet Season Shed Rebuild
2006-10-01: Making the Rudder Bulkheads
2006-10-01: Why Tom Is Sobbing In The Corner
2006-11-08: Colourful water tanks for Binary
2007-01-14: Carbon masts for Binary
2007-01-22: Binary’s First Repair
2007-01-25: Chamfer Panels/SternBeam
2007-02-12: Email from Alan – No 2
2007-02-12: Email from Alan – No 1.
2007-02-24: Rope work
2007-03-26: Main Beam Lower Flange
2007-03-27: Video of Main Beam Lower Flange
2007-04-07: Joining the main beam halves
2007-04-08: The Drunken Doorways
2007-04-10: Reinforcing Cutouts – Step 1
2007-04-13: Glass Ropes – Reinforcing Cutouts – Step 2
2007-04-16: Video of Reinforcing Cutouts – Step 3 Taping
2007-04-16: Video – Main Beam goes to the Boat
2007-05-04: Main Beam Fitted
2007-07-27: Main Beam Taping
2007-07-27: Carbon Masts – Update 1
2007-08-25: Front Cockpit Dreaming
2007-08-25: Rudder Cassette Cutout
2007-08-26: Forward Tape – Forebeam Bulkhead
2008-07-18: Fitting the head bulkheads – again
2007-08-26: Head Bulkheads – Remove and Reshape
2007-08-26: Stem Bulkhead to Bow
2007-08-26: Rear Beam – forward edge tape
2007-08-26: Bridge deck leading edge – support for kerfing
2007-08-27: Rear Beam Gusset
2007-09-11: Beetles and Epoxy (Sub Locker Bulkhead)
2008-02-04: Homebuilt CVI Workstation holding @ -98.5KPa
2008-01-03: Carbon Mast – Update 2
2008-01-06: Tropical Cyclone Helen
2008-02-11: Controlled Vacuum Infusion
2008-07-06: Bridge deck leading edge
2008-07-07: Forward Buoyancy Compartments 1
2008-07-14: Closing Voids – Buoyancy Compartments 2
2008-07-18: Forward mixing and wet out area
2008-07-24: Completed void ledge used as template
2008-07-26: Auxilliary Propulsion
2008-07-30: The sail lockers have soles
2008-07-30: ….and the boatbuilder has soles
2008-08-07: Top Bow Chamfer Panels, Designers and Builders
2008-08-14: Bridgedeck Leading Edge
2008-08-16: Reinforcing the kerfed leading edge
2008-09-07: Preparing the Fore Beam
2008-09-07: Presenting the Fore Beam
2008-09-07: Stress testing the presented fore beam
2008-11-16: Mooring Cleats
2008-09-28: “Just lay some uni over it and tape the rest”
2008-09-28: The fit of the fore beam
2008-09-29: Beam insert panel on the top bow chamfer panels
2008-10-02: Fore Beam Installed
2008-10-10: More Z joins as 5 years comes around
2008-10-28: Sail Locker Access Hatch Template
2008-11-02: Sail Locker Access Hatch Cutouts
2008-11-07: A Grapple of Anchors
2008-11-09: The Hound and the Hatches
2008-11-16: Forward Cleat Blocking
2008-11-15: Marinising the Waecos
2008-11-16: Deck reinforcement for cleat mounting
2008-11-17: Forward cleat blocking – installation
2008-11-19: Hatching – slowly
2009-02-09: Vacuum Bag Sealing Idea
2008-11-28: Bits of duflex to make a hatch or two
2008-11-27: More boat in a box
2008-11-29: Steering Unboxed
2008-11-30: Still Hatching
2009-02-05: Tread and Shelf
2008-12-29: A lot of photos of those bloody hatches
2008-12-28: Engines in boxes
2008-12-31: Hatch Infusion Layup
2008-12-31: Infusing the Access Hatches
2009-02-11: Composite Pad-Eyes
2009-02-08: Hatches – only seals and external paint to complete
2009-02-12: Fiddly Bits
2009-02-14: The Painter
2009-03-03: Draft plumbing design for Binary’s Lavac toilet
2009-03-08: Vacuum Infusion – details of our typical layup
2009-03-08: Jotun Imperite 300 and International Intergrip
2009-03-08: Coping with heat and humidity
2009-03-15: Front lockers finally finished
2009-03-21: More about our copper + epoxy antifouling
2009-03-24: Even bigger hatches
2009-03-25: Latch and hinge reinforcement
2009-04-19: Flange on the Mast Beam
2009-04-21: What goes in must come out
2009-05-09: No strip-planking on this boat
2009-05-11: Back yard windows
2009-05-12: So far with the even bigger hatches (engine access)
2009-05-14: Crocodile-proof foredeck access
2009-05-17: We are tired of climbing over the rear beam
2009-05-17: Is this normal?
2009-05-19: Now we can walk into the rear cockpit
2009-05-20: Last task for the day
2009-05-25: Aft bunk supports
2009-05-26: Stairway beams
2009-05-28: Overheads for the rear berths
2009-05-31: Aft central cleats
2009-05-31: Obverse, converse and reverse
2009-06-02: Bonding the aluminium backing plates for cleats
2009-06-03: Now the kids can visualise their bedrooms
2009-06-16: Aft cabin in bandages
2009-06-17: The back cabin bulkhead (BCB) offered up
2009-06-18: Two for one furniture
2009-06-20: The wayward router and the cabin furniture
2009-06-23: Lift, Glue, Screw and Clamp
2009-06-24: Shoulder Exercise
2009-06-26: Roundovers and Roundovers
2009-06-27: Convex in the cockpit and concave in the beam
2009-07-01: Ventilation and light
2009-07-06: Reinforcing the rear ventilation
2009-07-27: Ten (feeble) excuses
2009-08-22: Dutch Door Basics
2009-08-19: The BCB Saga
2009-08-20: The BCB Cut-outs
2009-08-21: Catwalk Beam Tops
2009-08-23: Extending the short door
2009-08-25: Door Making
2009-08-29: The Second Wall
2009-08-30: Reinforcing for Door Furniture
2009-08-30: Trial Door Fitting
2009-08-31: The BCB changes the shape of Binary
2009-09-20: Left hand $100 jigsaw, right hand $600 camera
2009-09-27: The catwalk beams are in
2009-09-28: H joins for the deck panels
2009-10-01: Water tank hatch basics
2009-10-03: Water Tank Hatch Doublers
2009-09-30: Head and Laundry Hatches
2009-10-02: Better core replacement
2009-10-03: Almost finished the water tank hatches
2009-10-22: Sealing and painting under the foredeck panels
2009-12-01: Glue, glue everywhere and little on the job
2009-10-23: Straps, holes and tie-downs
2009-10-25: Water tank bulkheads and paint
2009-10-29: Anchor system basics
2009-11-28: Anchor Locker
2009-11-29: Plumbing through bulkheads
2009-11-29: The almost ready deck panels
2009-12-03: The fore decks are on
2009-12-04: Occupational Health and Safety Inspection
2009-12-13: Deck and companionway side panels
2009-12-23: Drivelines for Christmas
2009-12-25: Emperor Penguins and Christmas
2010-01-26: Why are my conduit holes through the stern beam asymmetric?
2010-02-03: Shed
2010-03-11: Goin’ down the track
2010-05-16: We’re back blogging
2010-05-16: Stringer extensions within the aft beam
2010-05-17: Aft beam conduits
2010-05-17: Aft beam bulkheads
2010-05-18: Upper flange on the aft beam
2010-05-19: Top of the aft beam
2010-05-20: Don’t Ditch The Duflex
2010-05-23: No cranes required to move this boat
2010-07-23: The Move
2010-07-23: Binary in the Shed
2010-07-23: Companionway risers
2010-07-23: Companionway step reinforcement
2010-07-23: Companionway steps
2010-07-23: Quick visit to HCMC
2010-07-23: Whats happened to the BCB?
2010-07-24: Roof Panels
2010-09-24: Bridge Deck Cabin, Saloon, Coach House, Turret, Pilot House
2010-09-26: The Third Roof Panel
2010-09-27: Cabin Side Walls
2010-09-28: Trimming the forward roof overhang
2010-10-10: Prefabricating the front cabin walls
2010-10-11: Cutting and shaping panels
2010-10-14: Short tapes
2010-10-24: All Walls In
2010-11-18: Preparing for the wet
2011-01-02: 2010 in review
2011-03-11: Four month hiatus
2011-03-11: Project cost
2011-03-24: Fresh water distribution
2011-03-28: Downloadable files have been updated
2011-03-31: A better head design for Binary
2011-04-13: The most complicated schematic yet
2011-04-14: Adaptive Charging
2011-05-02: Why don’t all bridgedeck catamarans have a front door?
2011-05-27: The front cockpit – port side wall
2011-05-27: The front cockpit – starboard side wall
2011-05-27: The front cockpit – back wall
2011-05-27: Glass bars
2011-06-08: The front cockpit – preparing the floor
2011-06-08: The front cockpit – quadraxial suspension
2011-06-08: The front cockpit – floor drain
2011-06-08: The front cockpit – the floor doubler
2011-06-08: The shaft to gearbox coupling problem solved
2011-06-15: Composite chainplates
2011-08-16: Catwalk beam flanges
2011-08-17: Fastening the catwalk
2011-08-17: Anchor rollers and Meccano sets
2011-08-17: Wrapping the forebeam
2011-08-17: Forestay chainplate – preparing the stand
2011-08-17: Forestay chainplate – the glass wraps
2011-08-22: Baby stay chainplate – preparing the stand
2011-08-22: Baby stay chainplate – the glass wraps
2011-08-22: Frames for the trampolines
2011-08-24: Anchor chain alignment
2011-08-24: Robust Simplicity and the Art of Motor Sailing
2011-09-13: The chain way – eight holes
2011-09-13: The chain way – chainplate bulkhead
2011-09-13: The chain way – encasing the baby stay chainplate
2011-09-21: Drawing a large curved line
2011-09-21: The evolving shape of the trampoline frames
2011-09-28: Taping the trampoline frames
2011-09-28: Trampoline frames – core replacement
2011-10-10: Finishing the trampoline frame edges
2011-10-09: Blending the bow stem into the deck
2011-10-10: Sealing balsa edges on the catwalk
2011-10-10: First storm of the wet season 2011-12
2011-10-11: Installing forward anchor rollers
2011-10-14: Work platforms, cheap tools and rounding of topdeck edges.
2011-10-16: And another curve is added …
2011-10-28: For (i = 1; i < smooth boat surface; i++) {bog; sand;}
2011-11-10: A break from fairing
2011-11-09: Bob Oram’s website
2011-11-18: Early Christmas gift from the landlord
2011-11-23: Pinning the roof to its support poles – Part 1
2011-12-03: Pinning the roof to its support poles – Part 2
2011-12-04: Securing the support poles to the back beam
2011-12-22: A diversion: Tiny house building
2012-01-19: Christmas Cyclone
2012-01-26: At last, someone will transport our boat
2012-01-27: How to load a catamaran onto a truck without a crane
2012-01-28: The Move #2
2012-03-01: Repositioning the boat
2012-04-20: A wider firebreak






Recent Comments