The Move #2

We were very impressed with the skill and care with which Casey Haulage Darwin transported our boat. The entire operation was smooth and efficient, with the expected delay in the challenging entrance to our new place.

p20120128_071941

p20120128_072239

p20120128_072547

p20120128_072926

p20120128_073014

p20120128_073724

p20120128_073557

p20120128_073818

p20120128_074417

p20120128_080439

p20120128_080617

The next three photos show the most difficult part of the entire job – reversing a 6.5m wide load over a ditch and through a 7.1m clearance. Casey had no visibility from the driver’s seat and had to rely on directions from Tom and Les, his off-sider. It took several attempts.

p20120128_080906

p20120128_081211

p20120128_082421

Through at last…

p20120128_082959

To avoid turning around on our property, Casey reversed down the winding 250m driveway, navigating a tight spot between the house and a mango tree.

p20120128_083223

p20120128_085627

p20120128_090756

p20120128_091215

p20120128_091505

August and the dogs checking out the boat’s new location, while Tom and his good friend Graeme construct a beam which will support a large tarp.

p20120128_165017

Design a site like this with WordPress.com
Get started