Stem Bulkhead to Bow

These small spaces in each hull forward of the stem have been gathering spiders and dust since construction. The space is approximately 1.7m deep and flares from a point in the keel to a small 100mm triangle at the deck intersection. I have shaped off cut duflex pieces to fit the space and slowly filled with runny glue epoxy/silica mix. I have yet to complete the shape when integrating the deck and glass over.

p20070818_165018

p20070818_164936

Design a site like this with WordPress.com
Get started