Front lockers finally finished

This task was to create and complete both forward lockers and associated hatches. The photos mostly show the port locker however the starboard is an exact mirror image.

It has taken us through a large range of techniques and skills we haven’t addressed before up to and including completed fit-out. This was a deliberate process to give us (me in particular) confidence and even though it has taken a long time, it has equipped us well for the upper structure completion of Binary.

The first three photos below show the Jotocote 605 up to the deck bonding space.

p20090221_183404.jpg

p20090221_183445.jpg

p20090221_183502.jpg

Below is the external view of the hatch gutter and the locker drains.

p20090226_171326.jpg

Below are three views of the plumbing in and out fitting to the holding tank.

p20090303_104305.jpg

p20090303_104327.jpg

p20090303_163315.jpg

The next two views are of the holding tank.

p20090303_181931.jpg

p20090303_181959.jpg

Below is looking aft at the holding tank and the hatch gutter drains. The locker drain port to the left on the floor, just visible (click on image to select original size ) forward of the exiting gutter drain piping.

p20090308_200330.jpg

The next three are different views of the locker internals.

p20090308_200007.jpg

p20090308_200054.jpg

Below is looking forward.

p20090308_225404.jpg

Hatch open

p20090308_200730.jpg

Hatch closed

p20090308_200810.jpg

Design a site like this with WordPress.com
Get started